GC1NV7Z Traditional Cache Watts that Sound?
Type: Traditional | Size: Small Small | Difficulty: 1.5 out of 5 | Terrain: 1.5 out of 5
By: Taylorsgeotracker @ | Hide Date: 03/16/2009 | Status: Available
Country: United States | State: Colorado
Coordinates: N37° 42.083 W102° 37.825 | Last updated: 06/19/2022 | Fav points: 0

A very big Thank you to elrep for replacing the cache container. It seems that the cache hiding place (fence) seems to have dissappeared. Updated coords as of 04/23/2012. Thanks again! Happy caching!!



One of the world’s largest wind power projects – right here in Prowers County!



Humans have used the power of the wind for thousands of years – wind powered boats sailed the waters and mills ground grain into flour and pumped water from the ground. Today, here in Prowers County, wind powers the largest wind farm in Colorado. The 162 megawatt Colorado Green Wind Power Project, located 20 miles south of the Town of Lamar, was developed to help meet Colorado’s demand for renewable electricity. Completed in late 2003, the project utilizes 108 GE 1.5 MW wind turbines, the largest assembled in America. The project is owned by PPM Energy, Inc. and Shell WindEnergy Inc. in a 50/50 joint venture.
The Colorado Green development was born through a competitive bidding process initiated by Public Service of Colorado where it competed with others forms of electricity generation including natural gas and coal fired generation and was found to be the lowest cost alternative.



Power up with the wind!

What better place to harvest the wind than the windy prairies of southeastern Colorado. Dotted over the years by a variety of historic water-pumping windmills used by pioneers when settling in this part of the country, today the area blends its historic past with a progressive future. The Colorado Green Project resides on about 11,000 acres used as a working cattle ranch. Less than 2% of the project’s land area is used by the actual footprint of the wind turbines, leaving most of the land available for other purposes, including ranching and grazing – or, as the ranchers tell the story, the spaced used by the wind turbines translates to one less cow


Turbine Facts:




Manufactured by GE in Tehachapi, California, the Colorado Green Project’s 1.5 MW turbines are the largest wind turbines assembled in the United States
The Colorado Green Project is expected to produce enough wind-generated electricity to serve about 52,000 average American homes.
Turbine Height: 328 feet – taller than a 32-story building!
Over 294 cubic yards of concrete was used to complete each of the Project’s wind turbine foundations – that’s more than 47,400 tons to complete all 108 foundations, or 4,741 full concrete truckloads.
The Project’s wind turbines make one revolution every 2 to 3 seconds.
Each Colorado Green wind turbine blade is 112 feet long. A rotor is composed of three blades and has a diameter of 231 feet – 10% longer than the wingspan of a Boeing 747-400 jumbo jet


How does it work?

The rotor blades of a wind turbine work somewhat like the wings of an airplane. As air passes over the specially designed blades “lift” is created. This lift, in turn, sends the blades spinning in a circular motion, which drives an electric generator. When winds reach about 8 miles per hour, the rotor is engaged and the wind turbine begins producing power.



We found this area amazing, facinating, and one of the coolest unexpected places we have been in a while

We hope you will find it as amazing and worth the drive as we did!

Please make sure to respect the area and all signs etc. Thanks!

 Custom URLs

Add cache to watch list
Log your visit
Picture Gallery

 Nearby Caches

GC1NRR8 There's No Place Like (A) Home (187.49 kms W)
GC47T0R Snagged (203.35 kms W)
GC47RYT Twisted (203.40 kms W)
GC47RZT Little Leprechaun (203.87 kms W)
GC1NT3D Izze (220.51 kms NW)

   


Driving Directions

 Logs

5 Logs: Found it 5  

Found it 05/29/2019 By Yoda'sTreasure
I am on my way back home to Aurora, CO. I had to do some geocaching on the way there. Thank you for the fun hide. TNLN.

Found it 05/06/2019 By Spins7
Found it! Thanks!

Found it 04/20/2019 By SnailMan1
I took a little detour off of the highway to make the find. TFTC.

Found it 03/28/2019 By RustyBeerCan
Marma and I are headed up to bent county and loaded a couple more caches last night to find along the way. this was a very good stop and wish we had more time to spend.
thanks for bringing us here Smile[:x]

Found it 09/01/2018 By b_lass
What an awesome sight. Thank you for sharing the knowledge.